Accession number:
1950.0026Producers:
Production Years:
1950Languages:
- English
Film Properties:
- 16mm
- Black and White
- Sound
Length (feet):
750 (16mm)Length (minutes):
21Holding Institutions:
Library and Archives Canada: 16mm.
"The story of the construction and abilities of Rayner Dam, Ontario's highest hydro electric power development, officially opened in June 1950. Speech by Ontario Premier Lesley Frost."